BPS Board approves 2020-01 calendar, contracts for admin and teacher

Track team members to have pole vaulting available this year

The Bridgeport Board of Education had their regular meeting on Monday , March 9th in the High School Library and all members were present along with all administration and Ms. Vonnie Brown. There were several action items on the agenda ranging from roof repair to Teacher/Administrator contracts.

The board approved having the roof over the Music Room and Wood Shop replaced this summer by Fisher Roofing for a combined cost of $41,600. Superintendent Lambert stated that both roofs have leaked and been patched for the past six years.

Three action items involved administrative contracts and a teacher contract. Mr. Lambert has reported the last several meetings the importance he believed in having 3 FTE administrators and that when he came six years ago there were 4.6 administrators that cost $454K and the district now has 2.5 and pays a total of 331K which is a $120K difference.

 

To read more please log in or subscribe to the digital edition. http://www.etypeservices.com/Bridgeport%20News-BladeID393/

Bridgeport News-Blade

PO Box 400
Bridgeport, NE 69336-0400
(308) 262-0675